We’re building a stronger library to power collaboration.

 

Connecticut College has embarked on a $9.1 million renovation and expansion of Charles E. Shain Library that will transform the educational and social life of the campus community.

 

The new Shain will provide more comfortable, usable, technology-rich study spaces as well as new tools and services to foster digital scholarship. The project will also dramatically improve the library’s appearance and ambience.

 

Renovations began this summer. All of the information you need about the project can be found on these pages, and you can even follow the progress via webcam.

 

All this hard work will pay off in Fall 2015.


An update from the vice president for administration

August 20, 2014 |

The following message was sent to students on Aug. 20 from Ulysses B. Hammond, vice president for administration:

Before you return to campus for the 2014-15 academic year, I wanted to give you an update on the renovations to Shain Library and what it means for you.

Work started this summer both inside and outside the building, and you’ll come back to find Shain surrounded by construction fences that allow us to maintain a safe environment on campus. The “moat” in front of the building has been filled in to allow for the installation of a beautiful plaza, and the facade of the building has been removed, to be replaced by a large bank of windows that will let in much more natural light. Existing windows were removed and will be replaced by larger windows, and interior walls are being put into place for the new collaborative study spaces, classrooms and the Technology Commons.

There are many exciting changes ahead, and construction will continue throughout the year. Exterior work — which will include removing the roof of the building, among other projects — will continue through the end of November. On occasion, heavy equipment will be used, and there is the possibility the work will generate some noise. Every effort is being made to minimize disruption to our community, but some disturbances can be expected during such large-scale projects. We will alert you in advance of any substantial work that is scheduled to take place so you can plan study time and place accordingly.

After November, most of the renovation work will take place inside the sealed library and have little impact on the surrounding buildings and areas.

The contractors work from 7 a.m. to 4 p.m. on weekdays. Again, they know they are on a residential campus and make every effort to minimize any disruption their work could generate. The same firm managed construction of the science center at New London Hall and they are very familiar with Connecticut College and the needs of our community.

We have identified many alternate study spaces that offer opportunities to study away from the library. A guide and map showing these study spaces, as well as the locations of library services and other helpful information, will be distributed by your housefellow or floor governor upon your return to campus. And you can always find vital information and updates at www.conncoll.edu/shainreno.

NO PAIN, NO SHAIN. Our lighthearted motto during this project has a kernel of truth: There could be some occasional distractions while the library is renovated. But when Shain reopens in time for the Fall 2015 semester, Connecticut College will have a state-of-the-art library, full of technology-rich study spaces and tools and services to foster digital scholarship, as well as a beautiful look, comfortable furnishings and welcoming  atmosphere.

Thank you in advance for helping make this project one of the most important in the College’s history.

 Read More


Tags:

 Comment

No pane, no Shain

August 1, 2014 |

The first of several windows to be removed from Shain Library was taken out on July 31. The replacement windows will be much larger to allow more natural light into the building. The window openings are covered during this part of construction to protect the books still inside.


Tags: 

 Comment

No more moat

July 25, 2014 |

The space behind the new retaining wall in front of Shain Library has been filled it. This area will become the new walkway and outdoor plaza.


Tags: 

 Comment

Shain renovation project boosted by grant from George I. Alden Trust

July 23, 2014 |

The George I. Alden Trust has awarded Connecticut College a $175,000 grant to enhance and expand technological resources available in Shain Library. The Alden Trust supports higher education by focusing on small, independent undergraduate colleges recognized for educational excellence and strong leadership.

The grant will support the state-of-the-art upgrades that are part of the ongoing renovations, including the addition of more comfortable, usable, technology-rich study spaces as well as new tools and services to foster digital scholarship.

 Read More


Tags:

 Comment

PC Classroom takes shape

July 22, 2014 |

One of the busiest rooms on campus is one of the first to be reconstructed in Shain. Here are two views of the new PC Classroom: from outside (left) and from inside (right).


Tags: 

 Comment

What's the plan?

July 11, 2014 |

Vice President for Administration Ulysses Hammond, President Katherine Bergeron and Adam Moore, senior project manager for KBE Building Corporation, review construction plans for Shain Library.


Tags: 

 Comment

Don’t mess around with the demolition man*

June 16, 2014 |

Shain Library Reno Construction GIF

 

The sidewalks, patio and part of the bridge in front of Shain Library have been jackhammered into oblivion.

*With apologies to Sting.

 Read More


Tags:

 Comment

Open for business

June 9, 2014 |

The temporary library headquarters is open for business! Visit Ernst Common Room in Blaustein Humanities Center for a reference desk staffed by librarians, a circulation desk for requesting and picking up materials, group study spaces and shared computer workstations. As the summer progresses, additional study spaces and computer areas are being set up to prepare for the 2014-15 academic year.


Tags: 

 Comment

It's a sign!

June 6, 2014 |

Visitors to campus will learn about what's happening in Shain Library thanks to this lovely billboard.


Tags: 

 Comment

Ernst is starting to look like a library

June 3, 2014 |

Old and new: The reference desk just moved to Ernst as #ShainReno gets underway.